Flippers
Tie scope directly to MAO and projected profit.
Feature — Rehab Budgeting
Underwrite with a $/sqft estimate, then graduate to a trade-by-trade budget once the deal goes under contract. Compare contractor bids side-by-side and track every change order against the original.
Inside the feature
A rehab budget is the dollar plan for turning a distressed property into the after-repair condition the comps assume. Under-budgeting kills profit; over-budgeting kills offers. FoundREI gives you a structured, defensible budget that you can build in 30 seconds for underwriting and refine into a contractor-ready scope of work for execution.
From input to outcome
A clear workflow that keeps every decision attached to the same deal.
STEP 01
Start with a $/sqft preset based on condition.
STEP 02
Quantities, unit costs, and notes per trade.
STEP 03
Multiple contractor bids per trade with side-by-side view.
STEP 04
Snapshot saved; change orders tracked separately.
STEP 05
Mark items complete in project management and watch variance.
Built for the work
Tie scope directly to MAO and projected profit.
Hit the after-repair condition the appraiser needs for refinance.
Issue clean bid packets and track contractor performance.
Lean on category presets while you build your own pricing book.
| Tool | Trade-level | Bid comparison | Change orders |
|---|---|---|---|
| Notebook / phone notes | No | No | No |
| Spreadsheet template | Yes, manual | Manual | Manual |
| FoundREI | Yes | Built-in | First-class |
For underwriting you need a $/sqft estimate by scope level (cosmetic, mid, heavy, gut). For execution you need a trade-level breakdown — demo, framing, roof, HVAC, plumbing, electrical, drywall, flooring, paint, kitchen, baths, exterior, landscaping, contingency. FoundREI supports both and lets you graduate from one to the other as the deal moves forward.
Yes. Add multiple bids per trade and FoundREI shows them side-by-side, highlights the lowest and the median, and rolls the chosen bid into the master budget automatically.
Yes. Change orders are first-class line items with a separate approval state. The original budget stays intact for variance analysis.
Yes. Default 10% contingency that you can override per project. The number is shown on the budget and rolled into MAO calculations.
You can share read-only views with contractors and partners without giving them full org access.
Continue exploring features
Founding-member lifetime deal
Stop juggling spreadsheets, PDFs, and group chats.